# The Perigon Miami Beach

Construction progress on The Perigon Miami Beach, Miami + Broward + Palm Beach, seen by Draymere on the ground. HTML: https://draymere.com/projects/miami-broward/the-perigon-miami-beach-30b25302

The Perigon Miami Beach, 5333 Collins Avenue, Miami Beach, FL 33140, by Mast Capital · Starwood Capital. The developer announces completion in March 2027. Reports from 1 December 2026.

- Market: Miami + Broward + Palm Beach
- Developer: Mast Capital · Starwood Capital
- Address: 5333 Collins Avenue, Miami Beach, FL 33140
- Coordinates: 25.8324033, -80.120924
- Construction started: Apr 2024
- Announced completion: Mar 2027

Reports on this site begin on 1 December 2026, when the Miami + Broward + Palm Beach market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The Miami + Broward + Palm Beach market: https://draymere.com/coverage/miami/

## Nearby on our route

- [Ella Miami Beach](https://draymere.com/projects/miami-broward/ella-miami-beach-4ebab128) — Constellation Group · The Boschetti Group · Vietmar — 6940 Abbott Avenue, Miami Beach, FL 33141; announced completion Mar 2027
- [72 Carlyle Miami Beach](https://draymere.com/projects/miami-broward/72-carlyle-miami-beach-971e9ec0) — Lefferts — 600 72nd Street, Miami Beach, FL; announced completion Dec 2028
- [NoBe PARC Miami Beach](https://draymere.com/projects/miami-broward/nobe-parc-miami-beach-2b1d80ee) — Robert Finvarb Companies — 7140 Abbott Avenue, Miami Beach, FL 33141; announced completion Dec 2028
- [Aman Miami Beach](https://draymere.com/projects/miami-broward/aman-miami-beach-a73be650) — OKO Group · Access Industries — 3425 Collins Avenue, Miami Beach, FL 33140; announced completion Dec 2028
- [Casa Cipriani Miami Beach](https://draymere.com/projects/miami-broward/casa-cipriani-miami-beach-a7bf03ab) — 13th Floor Investments · Midtown Equities — 3611 Collins Avenue, Miami Beach, FL
