# LOFTY Brickell

Construction progress on LOFTY Brickell, Miami + Broward + Palm Beach, seen by Draymere on the ground. HTML: https://draymere.com/projects/miami-broward/lofty-brickell-4513eafd

LOFTY Brickell, 99 SW 7th Street, Miami, FL 33130, by Newgard Development Group · Two Roads Development. The developer announces completion in August 2027. Reports from 1 December 2026.

- Market: Miami + Broward + Palm Beach
- Developer: Newgard Development Group · Two Roads Development
- Address: 99 SW 7th Street, Miami, FL 33130
- Coordinates: 25.7677454, -80.19536
- Construction started: Jan 2023
- Announced completion: Aug 2027

Reports on this site begin on 1 December 2026, when the Miami + Broward + Palm Beach market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The Miami + Broward + Palm Beach market: https://draymere.com/coverage/miami/

## Nearby on our route

- [The Standard Residences, Brickell](https://draymere.com/projects/miami-broward/the-standard-residences-brickell-db8f6324) — Two Roads Development · Newgard Development Group — 690 SW 1st Avenue, Miami, FL 33130; announced completion Aug 2027
- [Brickell River](https://draymere.com/projects/miami-broward/brickell-river-6e73355a) — Prosper Group · Versluys Group — 99 SW 7th Street / 66 SW 6th Street / 625 SW 1st Avenue, Miami, FL (assemblage on the Miami River near Brickell); announced completion Dec 2028
- [One Twenty Brickell Signature Residences](https://draymere.com/projects/miami-broward/one-twenty-brickell-signature-residences-7f1b868f) — Property Markets Group — 120 SW 8th Street, Miami, FL; announced completion Dec 2028
- [One Twenty Brickell Residences](https://draymere.com/projects/miami-broward/one-twenty-brickell-residences-585b4e5e) — Property Markets Group — 120 SW 8th Street, Miami, FL 33130; announced completion Dec 2028
- [Seven Broadway](https://draymere.com/projects/miami-broward/seven-broadway-5a3e240b) — Ytech — 75 SW 15th Road, Miami, FL 33130; announced completion Dec 2030
