# 7200 Collins

Construction progress on 7200 Collins, Miami + Broward + Palm Beach, seen by Draymere on the ground. HTML: https://draymere.com/projects/miami-broward/7200-collins-42fc55af

7200 Collins, 7200 Collins Avenue, Miami Beach, FL, by Northlink Capital · Amicon. The developer announces completion in December 2027. Reports from 1 December 2026.

- Market: Miami + Broward + Palm Beach
- Developer: Northlink Capital · Amicon
- Address: 7200 Collins Avenue, Miami Beach, FL
- Coordinates: 25.8572213, -80.1206249
- Construction started: Nov 2025
- Announced completion: Dec 2027

Reports on this site begin on 1 December 2026, when the Miami + Broward + Palm Beach market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The Miami + Broward + Palm Beach market: https://draymere.com/coverage/miami/

## Nearby on our route

- [NoBe PARC Miami Beach](https://draymere.com/projects/miami-broward/nobe-parc-miami-beach-2b1d80ee) — Robert Finvarb Companies — 7140 Abbott Avenue, Miami Beach, FL 33141; announced completion Dec 2028
- [72 Carlyle Miami Beach](https://draymere.com/projects/miami-broward/72-carlyle-miami-beach-971e9ec0) — Lefferts — 600 72nd Street, Miami Beach, FL; announced completion Dec 2028
- [Ella Miami Beach](https://draymere.com/projects/miami-broward/ella-miami-beach-4ebab128) — Constellation Group · The Boschetti Group · Vietmar — 6940 Abbott Avenue, Miami Beach, FL 33141; announced completion Mar 2027
- [The Delmore](https://draymere.com/projects/miami-broward/the-delmore-a7826544) — Damac Properties — 8777 Collins Avenue, Surfside, FL; announced completion Dec 2029
- [Surf Row](https://draymere.com/projects/miami-broward/surf-row-fa5300aa) — LD&D · ONE Capital — 8800 Collins Avenue, Surfside, FL 33154; announced completion Dec 2027
