# Wickside

Construction progress on Wickside, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/wickside-10896c03

Wickside, 3-13 Hepscott Road, Hackney Wick, London E9 5HH, by Galliard Homes. The developer announces completion in June 2026. Reports from 1 December 2026.

- Market: London
- Developer: Galliard Homes
- Address: 3-13 Hepscott Road, Hackney Wick, London E9 5HH
- Coordinates: 51.541726, -0.0237813
- Construction started: Jan 2024
- Announced completion: Jun 2026

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Copper Yard at Union Bridge](https://draymere.com/projects/london/copper-yard-at-union-bridge-3c878e4d) — Taylor Wimpey — Hepscott Road, Hackney Wick, London E9 5HJ; announced completion Dec 2027
- [Hepscott Road / Rothbury Road](https://draymere.com/projects/london/hepscott-road-rothbury-road-65678d3a) — TSVC — Hepscott Road, Hackney Wick, London E9 5HH; announced completion Dec 2027
- [Swan Wharf, 60 Dace Road](https://draymere.com/projects/london/swan-wharf-60-dace-road-4b83afc2) — Anderson Group — 60 Dace Road, Bow, London E3 2NQ; announced completion Mar 2026
- [East Wick + Sweetwater — Phase 3](https://draymere.com/projects/london/east-wick-sweetwater-phase-3-cd39bd8a) — Places for People · Balfour Beatty — Waterden Road, East Wick, Queen Elizabeth Olympic Park, London E20; announced completion Dec 2028
- [Bridgewater Triangle](https://draymere.com/projects/london/bridgewater-triangle-772c7150) — Ballymore · LLDC — Bridgewater Road, Queen Elizabeth Olympic Park, London E15 2NJ; announced completion Mar 2028
