# The Chocolate Factory, Wood Green

Construction progress on The Chocolate Factory, Wood Green, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/the-chocolate-factory-wood-green-96f1b09b

The Chocolate Factory, Wood Green, 5 Clarendon Road, Wood Green N22 6XJ, by Workspace Group. The developer has announced no completion date. Reports from 1 December 2026.

- Market: London
- Developer: Workspace Group
- Address: 5 Clarendon Road, Wood Green N22 6XJ
- Coordinates: 51.5943323, -0.1147835
- Construction started: Jan 2023

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Smithfield Yard](https://draymere.com/projects/london/smithfield-yard-80a3ff16) — Dominus New Homes — 7, Cross Lane, London, N8 7SA, N8 7SA; announced completion Mar 2020
- [423-435 West Green Road](https://draymere.com/projects/london/423-435-west-green-road-3504401a) — Paul Simon Homes — 423-435 West Green Road, London N15 3PJ; announced completion Dec 2026
- [26-28 Brownlow Road](https://draymere.com/projects/london/26-28-brownlow-road-f241ff59) — Abbeytown — 26-28 Brownlow Road, Bounds Green, London N11 2DE
- [North Gate Park, St Ann's](https://draymere.com/projects/london/north-gate-park-st-ann-s-6f21cb2c) — Hill · Peabody — St Ann's,St Ann's Road, Tottenham, N15 3TH; announced completion Dec 2031
- [Woodberry Down — Peninsula House](https://draymere.com/projects/london/woodberry-down-peninsula-house-46db3aa3) — Berkeley Homes — Woodberry Down Estate Phases 2 - 8, N4; announced completion Oct 2026
