# The Bellamy

Construction progress on The Bellamy, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/the-bellamy-a2fc9d5a

The Bellamy, 29 Byng Street, Isle of Dogs, London E14 8LP, by Mount Anvil. The developer announces completion in December 2027. Reports from 1 December 2026.

- Market: London
- Developer: Mount Anvil
- Address: 29 Byng Street, Isle of Dogs, London E14 8LP
- Coordinates: 51.5006716, -0.023265
- Construction started: Mar 2024
- Announced completion: Dec 2027

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [25 Cuba](https://draymere.com/projects/london/25-cuba-99741d85) — Ballymore — 25 Cuba Street, Isle of Dogs, London E14; announced completion Dec 2029
- [South Quay Plaza — Berwick Tower](https://draymere.com/projects/london/south-quay-plaza-berwick-tower-fe3e6b8a) — Berkeley Homes — 183-189 Marsh Wall, Isle of Dogs, London E14 9TT; announced completion Dec 2028
- [Demo · Mellish Quay](https://draymere.com/projects/london/demo-mellish-quay-745429f8) — Hallam & Rowe Developments — Millharbour, Isle of Dogs, London E14 9JS; announced completion Aug 2027
- [Ailsa Wharf](https://draymere.com/projects/london/ailsa-wharf-dc210d9f) — Country Garden — Ailsa Street, London E14; announced completion Dec 2028
- [Aberfeldy Village — Phase 3b](https://draymere.com/projects/london/aberfeldy-village-phase-3b-5216b7f0) — EcoWorld London · Poplar HARCA — Aberfeldy Street, London E14
