# Prime Point

Construction progress on Prime Point, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/prime-point-36fe15a9

Prime Point, Plot 18.02 & 18.03  West Parkside,Stratford, London, SE10 0NF, by L&Q. The developer announces completion in December 2027. Reports from 1 December 2026.

- Market: London
- Developer: L&Q
- Address: Plot 18.02 & 18.03 West Parkside,Stratford, London, SE10 0NF
- Coordinates: 51.494906, 0.010927
- Construction started: May 2023
- Announced completion: Dec 2027

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Greenwich Millennium Village — Western Plaza](https://draymere.com/projects/london/greenwich-millennium-village-western-plaza-46321cc5) — Taylor Wimpey · Countryside Homes — West Parkside, Greenwich, London SE10 0BD; announced completion Jun 2026
- [Greenwich Peninsula — Plot M0121](https://draymere.com/projects/london/greenwich-peninsula-plot-m0121-906e7e42) — Knight Dragon — Lower Riverside, Greenwich Peninsula, London SE10; announced completion Jul 2028
- [Lyle Park West](https://draymere.com/projects/london/lyle-park-west-aecdff28) — L&Q — Knights Road, West Silvertown, London E16 2AT
- [Thameside West](https://draymere.com/projects/london/thameside-west-2e093ef1) — ARADA — Dock Road, Royal Docks, London E16 1AG
- [Herringham Quarter — Phase 1](https://draymere.com/projects/london/herringham-quarter-phase-1-9ea0a9da) — Hyde — Herringham Road, Charlton, London SE7 8NA; announced completion Dec 2026