# Park Quarter

Construction progress on Park Quarter, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/park-quarter-50b1072c

Park Quarter, Albert Road, New Barnet, London EN4 9SH, by Fairview New Homes. The developer announces completion in November 2028. Reports from 1 December 2026.

- Market: London
- Developer: Fairview New Homes
- Address: Albert Road, New Barnet, London EN4 9SH
- Coordinates: 51.6519726, -0.1732341
- Construction started: Sept 2024
- Announced completion: Nov 2028

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Park Quarter — Phase 2](https://draymere.com/projects/london/park-quarter-phase-2-0cc74249) — Fairview New Homes — Albert Road, New Barnet EN4 9SH; announced completion Dec 2026
- [Whalebones Park](https://draymere.com/projects/london/whalebones-park-fa52cd44) — Hill — Wood Street, Barnet, EN5 4DA; announced completion Aug 2027
- [The Tramworks](https://draymere.com/projects/london/the-tramworks-76d928af) — Taylor Wimpey — 679 High Road, North Finchley, London N12 0DA; announced completion Dec 2025
- [26-28 Brownlow Road](https://draymere.com/projects/london/26-28-brownlow-road-f241ff59) — Abbeytown — 26-28 Brownlow Road, Bounds Green, London N11 2DE
- [250 East End Road](https://draymere.com/projects/london/250-east-end-road-60c8381c) — Manak Homes — Land rear of 250 East End Road, East Finchley N2 8AU
