# Mitre Wharf

Construction progress on Mitre Wharf, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/mitre-wharf-cf5d5728

Mitre Wharf, 131 Scrubs Lane, College Park, London NW10 6QY, by London Green. The developer has announced no completion date. Reports from 1 December 2026.

- Market: London
- Developer: London Green
- Address: 131 Scrubs Lane, College Park, London NW10 6QY
- Coordinates: 51.5262723, -0.2329016
- Construction started: Mar 2026

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Old Oak Common](https://draymere.com/projects/london/old-oak-common-3e895e74) — OPDC — Old Oak, London NW10
- [Television Centre — The Ariel & Scenery House](https://draymere.com/projects/london/television-centre-the-ariel-scenery-house-fa82b33a) — Stanhope · Mitsui Fudosan — Wood Lane, White City, London W12 7RJ; announced completion Sept 2027
- [White City Living — Solaris Two](https://draymere.com/projects/london/white-city-living-solaris-two-02edd701) — St James — 54 Wood Lane, White City, London W12 7RQ; announced completion Dec 2027
- [White City Living — Cascades Three & Four](https://draymere.com/projects/london/white-city-living-cascades-three-four-8db5702d) — St James — 54 Wood Lane, White City, London W12 7RQ; announced completion Jun 2027
- [Royal Gateway](https://draymere.com/projects/london/royal-gateway-9f04d24d) — Barratt London — 81 Park View, Western Avenue, North Acton, London W3 0PU; announced completion Dec 2026
