# London Dock — Buildings H & J

Construction progress on London Dock — Buildings H & J, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/london-dock-buildings-h-j-83508293

London Dock — Buildings H & J, London Dock, Wapping, London E1W, by St George. The developer announces completion in August 2030. Reports from 1 December 2026.

- Market: London
- Developer: St George
- Address: London Dock, Wapping, London E1W
- Coordinates: 51.50852800000001, -0.0665974
- Announced completion: Aug 2030

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Demo · Crimscott Works](https://draymere.com/projects/london/demo-crimscott-works-aad73521) — Tanner Yard Developments Ltd — Crimscott Street, Bermondsey, London SE1; announced completion May 2027
- [The Liberty of Southwark](https://draymere.com/projects/london/the-liberty-of-southwark-e3884e4d) — Landsec — 15-33 Southwark Street, London SE1 1RQ
- [London Square Bermondsey — The Malthouse](https://draymere.com/projects/london/london-square-bermondsey-the-malthouse-778198a1) — London Square — Bermondsey, London SE1; announced completion Dec 2028
- [Bankside Yards — Opus](https://draymere.com/projects/london/bankside-yards-opus-0d3f2143) — Native Land — 64 Southwark Street, Bankside, London SE1 0PZ; announced completion Mar 2027
- [Craftwork Studios](https://draymere.com/projects/london/craftwork-studios-99101be0) — 1-3 Dufferin Street, London EC1Y 8NA; announced completion Jul 2026
