# Kidbrooke Village — Phase 5 Building C

Construction progress on Kidbrooke Village — Phase 5 Building C, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/kidbrooke-village-phase-5-building-c-f744b152

Kidbrooke Village — Phase 5 Building C, Weigall Road, Kidbrooke, London SE3 9FL, by Berkeley Homes. The developer has announced no completion date. Reports from 1 December 2026.

- Market: London
- Developer: Berkeley Homes
- Address: Weigall Road, Kidbrooke, London SE3 9FL
- Coordinates: 51.4594341, 0.0263615
- Construction started: Jan 2022

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Kidbrooke Village — Lily Residences](https://draymere.com/projects/london/kidbrooke-village-lily-residences-a131c580) — Berkeley Homes — Kidbrooke Village Centre,Phase 3, Cambert Way, Kidbrooke, SE3 9YP; announced completion Dec 2028
- [Kidbrooke Village — The Blackheath Collection](https://draymere.com/projects/london/kidbrooke-village-the-blackheath-collection-7b08ff06) — Berkeley Homes — 5 Pegler Square, Kidbrooke, London SE3 9FW; announced completion Sept 2025
- [Lewisham Gateway — Phase 2](https://draymere.com/projects/london/lewisham-gateway-phase-2-df4a0155) — Muse — Lewisham High Street, London SE13
- [Trinity Rise — Maryon Grove](https://draymere.com/projects/london/trinity-rise-maryon-grove-3c16fdec) — Lovell Partnerships — Maryon Road / Maryon Grove, Charlton, London SE7; announced completion Dec 2027
- [Greenwich Peninsula — Plot M0121](https://draymere.com/projects/london/greenwich-peninsula-plot-m0121-906e7e42) — Knight Dragon — Lower Riverside, Greenwich Peninsula, London SE10; announced completion Jul 2028
