# Hero of Switzerland, Loughborough Road

Construction progress on Hero of Switzerland, Loughborough Road, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/hero-of-switzerland-loughborough-road-de330774

Hero of Switzerland, Loughborough Road, 142 Loughborough Road, London SW9 7LL. The developer has announced no completion date. Reports from 1 December 2026.

- Market: London
- Address: 142 Loughborough Road, London SW9 7LL
- Coordinates: 51.46724039999999, -0.1055233
- Construction started: Aug 2023

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Geoffrey Close](https://draymere.com/projects/london/geoffrey-close-36168c3a) — Bellway London · Riverside Housing Association — Geoffrey Close, Camberwell, London SE5 9BY; announced completion Feb 2026
- [Shakespeare Road](https://draymere.com/projects/london/shakespeare-road-1badf644) — Urban & Provincial — Land east of Shakespeare Road, Brixton, London SE24 0PT; announced completion Jan 2028
- [Vauxhall Cross Island](https://draymere.com/projects/london/vauxhall-cross-island-2d28ebf1) — VCI Property Holding — Wandsworth Road, London SW8; announced completion Mar 2030
- [Vauxhall Square](https://draymere.com/projects/london/vauxhall-square-b151fe9b) — Far East Consortium — Wandsworth Road, London SW8
- [Oval Village](https://draymere.com/projects/london/oval-village-860bad81) — Berkeley Homes — Oval Village,37 Montford Place, London, SE11 5DE; announced completion Feb 2027
