# Former London Chest Hospital, Bonner Road

Construction progress on Former London Chest Hospital, Bonner Road, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/former-london-chest-hospital-bonner-road-2a7827d8

Former London Chest Hospital, Bonner Road, Bonner Road, Bethnal Green, London E2 9JX, by Latimer. The developer announces completion in September 2027. Reports from 1 December 2026.

- Market: London
- Developer: Latimer
- Address: Bonner Road, Bethnal Green, London E2 9JX
- Coordinates: 51.5312932, -0.0484589
- Construction started: Jun 2024
- Announced completion: Sept 2027

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Regent's View — Westwood Building](https://draymere.com/projects/london/regent-s-view-westwood-building-7b019769) — St William — Marian Place, Bethnal Green, London E2 9AP
- [Regent's View](https://draymere.com/projects/london/regent-s-view-fb13718e) — St William — Marian Place, Bethnal Green, London E2 9AP; announced completion Dec 2026
- [Bow Green — Phase Two](https://draymere.com/projects/london/bow-green-phase-two-78157216) — St James — Bow Common Lane, London E3
- [Bow Green — Bow Apartments](https://draymere.com/projects/london/bow-green-bow-apartments-198239d2) — St James — 120 Bow Common Lane, London E3
- [Bow Green — Botanical Apartments](https://draymere.com/projects/london/bow-green-botanical-apartments-4567bb56) — St James — 120 Bow Common Lane, Bow, London E3 4BH; announced completion Mar 2027
