# East Wick + Sweetwater — Phase 3

Construction progress on East Wick + Sweetwater — Phase 3, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/east-wick-sweetwater-phase-3-cd39bd8a

East Wick + Sweetwater — Phase 3, Waterden Road, East Wick, Queen Elizabeth Olympic Park, London E20, by Places for People · Balfour Beatty. The developer announces completion in December 2028. Reports from 1 December 2026.

- Market: London
- Developer: Places for People · Balfour Beatty
- Address: Waterden Road, East Wick, Queen Elizabeth Olympic Park, London E20
- Coordinates: 51.545679, -0.0191659
- Construction started: Jan 2026
- Announced completion: Dec 2028

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Bridgewater Triangle](https://draymere.com/projects/london/bridgewater-triangle-772c7150) — Ballymore · LLDC — Bridgewater Road, Queen Elizabeth Olympic Park, London E15 2NJ; announced completion Mar 2028
- [East Wick + Sweetwater — Phases 4/5](https://draymere.com/projects/london/east-wick-sweetwater-phases-4-5-c193e3ba) — Places for People · Balfour Beatty — Queen Elizabeth Olympic Park, London E20; announced completion Dec 2031
- [Hepscott Road / Rothbury Road](https://draymere.com/projects/london/hepscott-road-rothbury-road-65678d3a) — TSVC — Hepscott Road, Hackney Wick, London E9 5HH; announced completion Dec 2027
- [Copper Yard at Union Bridge](https://draymere.com/projects/london/copper-yard-at-union-bridge-3c878e4d) — Taylor Wimpey — Hepscott Road, Hackney Wick, London E9 5HJ; announced completion Dec 2027
- [Wickside](https://draymere.com/projects/london/wickside-10896c03) — Galliard Homes — 3-13 Hepscott Road, Hackney Wick, London E9 5HH; announced completion Jun 2026
