# Crown Wharf

Construction progress on Crown Wharf, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/crown-wharf-a3a7f3a7

Crown Wharf, Bidder Street, Canning Town, London E16 4ST, by Barratt London. The developer announces completion in December 2028. Reports from 1 December 2026.

- Market: London
- Developer: Barratt London
- Address: Bidder Street, Canning Town, London E16 4ST
- Coordinates: 51.517328, 0.0037016
- Construction started: Jan 2025
- Announced completion: Dec 2028

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Cerulean Quarter — Phase 2](https://draymere.com/projects/london/cerulean-quarter-phase-2-6b847e89) — English Cities Fund — E16 4PA; announced completion Dec 2027
- [London City Island — Phase 2](https://draymere.com/projects/london/london-city-island-phase-2-7e93afc1) — EcoWorld Ballymore — London City Island, London E14
- [Heron Wharf — Phases 2 & 3](https://draymere.com/projects/london/heron-wharf-phases-2-3-8df97cdc) — St William — Leven Road, London E14; announced completion Dec 2025
- [Heron Wharf — The Millhouse](https://draymere.com/projects/london/heron-wharf-the-millhouse-ce3b663c) — St William — Leven Road, London E14
- [Aberfeldy Village — Phase 3b](https://draymere.com/projects/london/aberfeldy-village-phase-3b-5216b7f0) — EcoWorld London · Poplar HARCA — Aberfeldy Street, London E14
