# Coronation Square

Construction progress on Coronation Square, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/coronation-square-6c506b54

Coronation Square, 100 Oliver Road, Leyton, E10 5JY, by Taylor Wimpey. The developer announces completion in December 2027. Reports from 1 December 2026.

- Market: London
- Developer: Taylor Wimpey
- Address: 100 Oliver Road, Leyton, E10 5JY
- Coordinates: 51.562042, -0.015731
- Construction started: Nov 2021
- Announced completion: Dec 2027

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Avenue Road Estate, Langthorne Road](https://draymere.com/projects/london/avenue-road-estate-langthorne-road-9df95286) — Waltham Forest Council — Langthorne Road, Leytonstone, London E11; announced completion Mar 2030
- [Chobham Farm North](https://draymere.com/projects/london/chobham-farm-north-f7060c8d) — Fairview New Homes — Leyton Road / Liberty Bridge Road, Stratford, London E15 1DT; announced completion Dec 2027
- [East Wick + Sweetwater — Phase 3](https://draymere.com/projects/london/east-wick-sweetwater-phase-3-cd39bd8a) — Places for People · Balfour Beatty — Waterden Road, East Wick, Queen Elizabeth Olympic Park, London E20; announced completion Dec 2028
- [Bridgewater Triangle](https://draymere.com/projects/london/bridgewater-triangle-772c7150) — Ballymore · LLDC — Bridgewater Road, Queen Elizabeth Olympic Park, London E15 2NJ; announced completion Mar 2028
- [East Wick + Sweetwater — Phases 4/5](https://draymere.com/projects/london/east-wick-sweetwater-phases-4-5-c193e3ba) — Places for People · Balfour Beatty — Queen Elizabeth Olympic Park, London E20; announced completion Dec 2031
