# Bow Green — Phase Two

Construction progress on Bow Green — Phase Two, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/bow-green-phase-two-78157216

Bow Green — Phase Two, Bow Common Lane, London E3, by St James. The developer has announced no completion date. Reports from 1 December 2026.

- Market: London
- Developer: St James
- Address: Bow Common Lane, London E3
- Coordinates: 51.5205575, -0.0267107

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Bow Green — Bow Apartments](https://draymere.com/projects/london/bow-green-bow-apartments-198239d2) — St James — 120 Bow Common Lane, London E3
- [Bow Green — Botanical Apartments](https://draymere.com/projects/london/bow-green-botanical-apartments-4567bb56) — St James — 120 Bow Common Lane, Bow, London E3 4BH; announced completion Mar 2027
- [Leaside Lock — The Waterside](https://draymere.com/projects/london/leaside-lock-the-waterside-9ba2ea5d) — Guinness Homes — Imperial Street, Bromley-by-Bow, London E3 3ED
- [Ailsa Wharf](https://draymere.com/projects/london/ailsa-wharf-dc210d9f) — Country Garden — Ailsa Street, London E14; announced completion Dec 2028
- [Bromley-by-Bow Gasworks](https://draymere.com/projects/london/bromley-by-bow-gasworks-c6e2e03b) — St William — Twelvetrees Crescent, Bromley-by-Bow, London E3 3JH; announced completion Jun 2044
