# Bankside Yards — Opus

Construction progress on Bankside Yards — Opus, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/bankside-yards-opus-0d3f2143

Bankside Yards — Opus, 64 Southwark Street, Bankside, London SE1 0PZ, by Native Land. The developer announces completion in March 2027. Reports from 1 December 2026.

- Market: London
- Developer: Native Land
- Address: 64 Southwark Street, Bankside, London SE1 0PZ
- Coordinates: 51.5050238, -0.0958266
- Construction started: Jan 2021
- Announced completion: Mar 2027

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [The Liberty of Southwark](https://draymere.com/projects/london/the-liberty-of-southwark-e3884e4d) — Landsec — 15-33 Southwark Street, London SE1 1RQ
- [London Square Bermondsey — The Malthouse](https://draymere.com/projects/london/london-square-bermondsey-the-malthouse-778198a1) — London Square — Bermondsey, London SE1; announced completion Dec 2028
- [One The Thames](https://draymere.com/projects/london/one-the-thames-ef230a63) — Store Holdings — Arundel Great Court, South Site,Temple Place, London, WC2R 2NS; announced completion Dec 2026
- [Demo · Crimscott Works](https://draymere.com/projects/london/demo-crimscott-works-aad73521) — Tanner Yard Developments Ltd — Crimscott Street, Bermondsey, London SE1; announced completion May 2027
- [Craftwork Studios](https://draymere.com/projects/london/craftwork-studios-99101be0) — 1-3 Dufferin Street, London EC1Y 8NA; announced completion Jul 2026