# Ailsa Wharf

Construction progress on Ailsa Wharf, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/ailsa-wharf-dc210d9f

Ailsa Wharf, Ailsa Street, London E14, by Country Garden. The developer announces completion in December 2028. Reports from 1 December 2026.

- Market: London
- Developer: Country Garden
- Address: Ailsa Street, London E14
- Coordinates: 51.5097502, -0.017595
- Announced completion: Dec 2028

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Aberfeldy Village — Phase 3b](https://draymere.com/projects/london/aberfeldy-village-phase-3b-5216b7f0) — EcoWorld London · Poplar HARCA — Aberfeldy Street, London E14
- [South Quay Plaza — Berwick Tower](https://draymere.com/projects/london/south-quay-plaza-berwick-tower-fe3e6b8a) — Berkeley Homes — 183-189 Marsh Wall, Isle of Dogs, London E14 9TT; announced completion Dec 2028
- [Rivermark — Tramways House](https://draymere.com/projects/london/rivermark-tramways-house-0fd5ec0d) — Taylor Wimpey — Leven Road, Poplar, London E14 0LL; announced completion Sept 2026
- [25 Cuba](https://draymere.com/projects/london/25-cuba-99741d85) — Ballymore — 25 Cuba Street, Isle of Dogs, London E14; announced completion Dec 2029
- [Heron Wharf — Phases 2 & 3](https://draymere.com/projects/london/heron-wharf-phases-2-3-8df97cdc) — St William — Leven Road, London E14; announced completion Dec 2025
