# Aberfeldy Village — Phase 3b

Construction progress on Aberfeldy Village — Phase 3b, London, seen by Draymere on the ground. HTML: https://draymere.com/projects/london/aberfeldy-village-phase-3b-5216b7f0

Aberfeldy Village — Phase 3b, Aberfeldy Street, London E14, by EcoWorld London · Poplar HARCA. The developer has announced no completion date. Reports from 1 December 2026.

- Market: London
- Developer: EcoWorld London · Poplar HARCA
- Address: Aberfeldy Street, London E14
- Coordinates: 51.5136315, -0.0056283

Reports on this site begin on 1 December 2026, when the London market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The London market: https://draymere.com/coverage/london/

## Nearby on our route

- [Heron Wharf — Phases 2 & 3](https://draymere.com/projects/london/heron-wharf-phases-2-3-8df97cdc) — St William — Leven Road, London E14; announced completion Dec 2025
- [Heron Wharf — The Millhouse](https://draymere.com/projects/london/heron-wharf-the-millhouse-ce3b663c) — St William — Leven Road, London E14
- [Rivermark — Tramways House](https://draymere.com/projects/london/rivermark-tramways-house-0fd5ec0d) — Taylor Wimpey — Leven Road, Poplar, London E14 0LL; announced completion Sept 2026
- [Crown Wharf](https://draymere.com/projects/london/crown-wharf-a3a7f3a7) — Barratt London — Bidder Street, Canning Town, London E16 4ST; announced completion Dec 2028
- [London City Island — Phase 2](https://draymere.com/projects/london/london-city-island-phase-2-7e93afc1) — EcoWorld Ballymore — London City Island, London E14
