# The Watercrest By Ellington

Construction progress on The Watercrest By Ellington, Dubai, seen by Draymere on the ground. HTML: https://draymere.com/projects/dubai/the-watercrest-by-ellington-56feea49

The Watercrest By Ellington, The Watercrest By Ellington , Wadi Al Safa 3, Dubai, by Ellington. The developer announces completion in March 2028. Reports from 1 December 2026.

- Market: Dubai
- Developer: Ellington
- Address: The Watercrest By Ellington , Wadi Al Safa 3, Dubai
- Coordinates: 25.126614, 55.35016
- Planning started: Mar 2025
- Construction started: Jan 2025
- Announced completion: Mar 2028

Reports on this site begin on 1 December 2026, when the Dubai market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The Dubai market: https://draymere.com/coverage/dubai/

## Nearby on our route

- [Selora Residences](https://draymere.com/projects/dubai/selora-residences-f962c63d) — Swank Developments — Selora Residences, Wadi Al Safa 3, Dubai; announced completion Apr 2027
- [Knightsbridge Park 2](https://draymere.com/projects/dubai/knightsbridge-park-2-07d47bf6) — Leos Sof Real Estate Development L.L.C — Knightsbridge Park 2 , Wadi Al Safa 3, Dubai; announced completion Nov 2027
- [The Beachfront Villas By Ellington](https://draymere.com/projects/dubai/the-beachfront-villas-by-ellington-fb42f4d8) — Ellington — The Beachfront Villas By Ellington, Wadi Al Safa 3, Dubai; announced completion Aug 2026
- [Numa Reserve](https://draymere.com/projects/dubai/numa-reserve-603f69bf) — Mirfa IBC Developers — Numa Reserve , Wadi Al Safa 3, Dubai; announced completion Dec 2026
- [Knightsbridge Park](https://draymere.com/projects/dubai/knightsbridge-park-590b74bd) — Leos Sof Real Estate Development L.L.C — Knightsbridge Park, Wadi Al Safa 3, Dubai; announced completion Nov 2027
