# Athlon By Al Dar 1

Construction progress on Athlon By Al Dar 1, Dubai, seen by Draymere on the ground. HTML: https://draymere.com/projects/dubai/athlon-by-al-dar-1-d7927674

Athlon By Al Dar 1, Athlon By Al Dar 1, Wadi Al Safa 5, Dubai, by Aurora Spv 3 L.L.C. The developer announces completion in May 2028. Reports from 1 December 2026.

- Market: Dubai
- Developer: Aurora Spv 3 L.L.C
- Address: Athlon By Al Dar 1, Wadi Al Safa 5, Dubai
- Coordinates: 25.060069, 55.316003
- Planning started: Jul 2024
- Construction started: Jul 2024
- Announced completion: May 2028

Reports on this site begin on 1 December 2026, when the Dubai market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The Dubai market: https://draymere.com/coverage/dubai/

## Nearby on our route

- [Athlon By Al Dar 2](https://draymere.com/projects/dubai/athlon-by-al-dar-2-c466662c) — Aurora Spv 3 L.L.C — Athlon By Al Dar 2, Wadi Al Safa 5, Dubai; announced completion Sept 2028
- [The Grove At Sobha Sanctuary](https://draymere.com/projects/dubai/the-grove-at-sobha-sanctuary-d034092e) — Sobha Realty — The Grove At Sobha Sanctuary, Al Yufrah 1, Dubai; announced completion Aug 2030
- [Rise By Athlon 4](https://draymere.com/projects/dubai/rise-by-athlon-4-2616d4d1) — Aldar Properties PJSC — Rise By Athlon 4, Wadi Al Safa 5, Dubai; announced completion Dec 2029
- [Rise By Athlon 3](https://draymere.com/projects/dubai/rise-by-athlon-3-c364121b) — Aldar Properties PJSC — Rise By Athlon 3, Wadi Al Safa 5, Dubai; announced completion Jan 2030
- [Rise By Athlon 1](https://draymere.com/projects/dubai/rise-by-athlon-1-65554bbb) — Aldar Properties PJSC — Rise By Athlon 1, Wadi Al Safa 5, Dubai; announced completion Dec 2029
