# 09 Life Residences

Construction progress on 09 Life Residences, Dubai, seen by Draymere on the ground. HTML: https://draymere.com/projects/dubai/09-life-residences-e2430dc8

09 Life Residences, 09 Life Residences, Wadi Al Safa 5, Dubai, by Deniz Development. The developer announces completion in December 2027. Reports from 1 December 2026.

- Market: Dubai
- Developer: Deniz Development
- Address: 09 Life Residences, Wadi Al Safa 5, Dubai
- Coordinates: 25.096927, 55.372446
- Planning started: Jan 2026
- Construction started: Nov 2025
- Announced completion: Dec 2027

Reports on this site begin on 1 December 2026, when the Dubai market opens. Access is on sale now, paid once.

## What a subscriber sees on this project

- Visits on a schedule
- Photographs from each visit
- The step the building is at, on our ladder
- Our own handover estimate against the developer's date
- Every move of that date, kept
- The whole market in one feed

In each report: the date, photographs from the same places each time, the step, a note from the specialist where something needs saying, the estimate.

Prices: https://draymere.com/pricing/

The Dubai market: https://draymere.com/coverage/dubai/

## Nearby on our route

- [Terra Tower](https://draymere.com/projects/dubai/terra-tower-f0aa2b08) — Dugasta — Terra Tower, Wadi Al Safa 5, Dubai; announced completion Apr 2027
- [Celesto Tower 2](https://draymere.com/projects/dubai/celesto-tower-2-1dcc707b) — Tarrad Development — Celesto Tower 2, Wadi Al Safa 5, Dubai; announced completion Jun 2028
- [Weybridge Gardens 2](https://draymere.com/projects/dubai/weybridge-gardens-2-72ea7661) — LEOS International — Weybridge Gardens 2, Wadi Al Safa 5, Dubai
- [Cove Edition Residence 3 By Imtiaz](https://draymere.com/projects/dubai/cove-edition-residence-3-by-imtiaz-5d0b98a2) — Imtiaz Developments — Cove Edition Residence 3 By Imtiaz, Wadi Al Safa 5, Dubai; announced completion Dec 2026
- [Celesto Tower 3](https://draymere.com/projects/dubai/celesto-tower-3-329fc0aa) — Tarrad Development — Celesto Tower 3, Wadi Al Safa 5, Dubai; announced completion Sept 2028
